Modern Readymix

Photo Gallery


Introduction

 

Modern Est. for Ready Mix was established in 1984, which has contributed a considerable role in the development of Al Ain City by way supplying major share of quality concrete to various government and private sector projects.

 

Currently the company have 7 batching plants with a combined capacity of 540m3/hour. Also having Ice Plants, fleet of 48 nos. transit mixers, 11 nos. concrete pumps with boom length up to 43 mtrs assisted with shovels, trailers and light vehicles. Such capacity have enabled to produce more than 35,000 cubic meters concrete per month which made us one of the leading and most competitive supplier of Ready Mix in Al Ain Area.

 

 

Management

Management is represented by the following personnel who are well known and well experienced in the industry and have strong influence in the market.

 

Mr Qusai Al Ghussein - General Manager

Mr Bashar Al Saadi - Executive Manager

Mr Abdul Fatha Salama - Finance Manager

Eng. Tariq Farouk Aziz - Maintenance Manager

Eng. N. Anirajan - Technical Manager

 

The management always ensure to keep the corporate value in each transactions and to deliver best quality products and service to our customers.

 

Approvals

Modern Ready Mix is an ISO 9001:2008 certified company for Quality Management Systems and also having approvals for ISO 14001:2004 – Environmental Management Systems & OHSAS 18001:2007 – Occupational Health & Safety Standards.

 

Also, the company has been approved by various government bodies and consultant offices such as:

 

Major Ministries & Government Depts.

 

1. Al Ain Municipality

2. Department of Transport (DoT)

3. Abu Dhabi Water & Electricity (ADWEA)

4. Abu Dhabi Sewerage Services Company (ADSSC)

5. Al Ain Distribution Company (AADC)

6. ADNOC

7. Etisalat Corporation

8. Dept. of Military Works (DMW)

9. Ministry of Interior – Police Projects Committee

10. Abu Dhabi Center for Housing & Service Facilities Development (UDC)

11. MUSANADA

12. Abu Dhabi Commercial Engineering (ADCE)

13). Major Consultants in the Constructions Industry

 

Quality Control

Quality Control is of prime importance to our business and as such it has been organized in a manner to ensure the production of the required grades and quality of concrete through various stages of work starting from materials selection until the delivery of concrete to the point of pour.

 

In addition to the in-house quality control of the materials and the concrete products, Modern Ready Mix employs the services of reputable independent certified testing laboratories for continuous monitoring of the materials quality as per the international standards.

 

It is our main corporate value to supply quality products to our valued customers.

 

Health, Environment and Safety

Environment protection is a major goal for the company. By adding dust collectors for our main plants and integrated recycling system for the waste water, we are successfully moving in the path of producing environment friendly concrete to join Abu Dhabi ESTIDAMA program. Also, our Safety standards aim the goal Zero Accident Philosophy at all levels in our operations.

 

All these activities clearly show our hard efforts to achieve the company's vision 'protect our environment'. We have taken various measures in order to achieve our vision in the area of Health, Safety and Environment, like:-

 

A) FILTER SYSTEMS

The filter system has been designed for dust management and the system helps to collect the maximum dusts emitting in each stages of production process. Thus maintaining the air quality and giving maximum protection to the environment and people.

We are proud to say that we are the only one Ready Mix manufacturer in Al Ain to have dust collector system for the whole batching plants in order to ensure green environment and maximum protection for our natural world.

 

B) WATER TREATMENT PLANT

The state of the art water treatment plant with 20,000 Gallons per day capacity has been installed as part of our core vision for waste water management to save our natural resources.

The integrated recycling system has been designed to ensure that it collects the complete waste water and the recycled the water meets all the required parameters and quality.

 

C) HEALTH AND SAFETY

Modern Ready Mix maintains a vigorous safety program to ensure that all reasonable and practicable measures are taken to maintain safety in all stages and areas of our operations.

 

Our HSE dept. ensures that each employee of our company and our sub-contractors to adopt and promote the "Zero Accident Policy" through integrating safety into the planning, execution and all the other process of work conducted in our operation.

 

Moreover integrating all our efforts and achievements we have successfully achieved international standards of ISO 14001:2004 for Environmental Management and OHSAS 18001:2007 for Health & Safety.

 

Equipments

We are fully equipped with the state of the art equipments to meet all the necessary demands of the concrete industry such as:

 

• Fully computerized Batching Plants

• Mobile Batching Plant

• Ice Plants / Water Chillers

• Transit Mixers

• Mobile Concrete Pumps

• Stationary Concrete Pumps

• Cement Bulkers

• Trailers

• Fully Equipped Laboratory etc.

 

All our batching plants / lab equipments & tools test and calibrate according to industry standards by approved independent to ensure that our products meets the required quality always.

 

Also we are having a well equipped service center and technical team to maintain our fleet of vehicles and equipments.

 

Major Projects

Modern Ready Mix has been appointed for many prestigious projects in Al Ain and its surroundings. These includes both of government and private projects. Few of them are mentioned below:

 

1. The Mall, Al Ain Project

2. Al Ain Hypermarket

3. Al Foa’a Mall

4. Construction of bulk Fuel Storage Tanks with Related Systems (DMW)

5. Road & Infrastructure Works for Shiab Al Ashkar Neighbourhood

6. Road Maintenance & Rehabilitation Work for Abu Dhabi Strategice Roads -Zone-2, Al Ain Rg

7. Maintenance of Roads & Bridges in Al Ain Region – Phase 4

8. TSE Lines from 6 MIG Reservoir at Al Maqam Interchange to Various Locations (ADSSC)

9. Construction of Police Stations at Al Saad, Al Maqam & Al Jeemi (Abu Dhabi P. D.)

10. Al Ain Resort Hotel & Water Park Extension

11. Minor Roads & Parking in Al Ain – Stage IV

15. Emergency Maintenance Works for Existing Roads & Bridges and for their Furniture for Al

Ain Region

16. Sewerage Connections and Related Works for Isolated Properties in Al Ain Region – Phase 1

(ADSSC)

17. Hili Residential Complex Project

18. Upgrading Traffic Movements & Intersection in Central Area of Al Ain

19. UAE University new campus PPP development

20. Infrastructure works for Neima public housing

21. Dualling & Improvement of Traffic Safety of Al Ain – Nahil Rd.

22. Cold Store in Al Saad Dates Factory

23. Molecular Image Center at Tawam Hospital

24. Construction of Sewerage connections and related works in Al Ain Region

25. Storm Water Drainage of the Western Area of Al Ain - MT5

26. Dualling of Al Ain-Al-Wagan-Al Qua’a Rd

27. Al Qua’a Residential Complex Project

28. Many other Private / Residential Villas & Commercial Complex Projects

 

 

Contact

PO Box: 80817 Al Ain, UAE

Tel: 03-7217333

Fax: 03-7218333

 

www.modernreadymix.ae

 

Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 

Copyright 2012 Bin Harmal Group